Coaterex

Coating Application & Production Parameter Checklist

Optimize your coating quality with our operational checklist. Ensure viscosity, coat weight, and correct drying in every shift.

Instant download
Editable format

Download Checklist

Receive the Excel and PDF format to use in your plant

By submitting this form, you agree to our privacy policy. We will use your data only to send you the file and contact you about related products.

Why use this checklist?

Zero Waste

Detect viscosity deviations before affecting thousands of meters of production.

Shift-to-Shift Quality

Standardize parameters so the night shift performs as well as the day shift.

Chemical Savings

Control the applied coat weight (GSM) to avoid exceeding the necessary consumption.

Data History

Create a database of your runs for future optimizations and audits.

Full process control

The checklist covers the 5 critical pillars of water-based barrier application in corrugators and converters.

Checklist Mockup

Master Production Checklist

Excel + PDF • Designed for operators and QA

Included modules:

  • 1Pre-Start: Anilox cleaning and conditioning
  • 2Mixing & Viscosity: pH and solids control
  • 3Machine Parameters: Speed, pressure, and temperature
  • 4In-Line Control: Uniformity, drying, and tack
  • 5Lab Testing: Cobb, Kit, and Adhesion

Take your plant to the next level

Download today the tool used by leading plants to ensure the quality of their sustainable packaging.

Hello! How can we help?